The final symposium of the OLLA OLED lighting project took place on the High Tech Campus in Eindhoven Netherlands 12.6.08 with about 80 attending the exhibition and about 60 attending the half day conference. The objective is to start the work that will lead to replacement of many of the "6 billion lights that the world buys every year". Presentations from OLLA, Siemens, Novaled, Fraunhofer IPMS, Philips Lighting OLED Development and Royal Philips Electronics and the exhibition alongside revealed that the objectives had been met or exceeded. These objectives embraced laboratory demonstration of sharply improved life for 1000 cd/m2 emission and larger panel size etc, compared to what was available when the project was conceived five years ago.
Polymer OLEDs, despite being printable, were bypassed early on to concentrate on glass sandwiches of small molecule OLEDs. Here, phosphorescent layers exhibited poor life so the long life Novaled PIN OLED construction was favored. All this had echoes of Philips earlier abandoning P-OLEDs on the same campus.